HG Wells self-contained wireline truck with raised mast and crew on location
HG Wells Ltd — Oilfield Well Intervention Services
Specialist well intervention

HG Wells Ltd — Specialist Well Intervention. Pressure is partof the work.

Well Intervention Services, Consultancy and Equipment Supply to the Oil and Gas Industry.

Operational clarity / 01Available for new work

Confirmed safety report

1,965days without a lost-time injury (LTI)

As at · reported figure, not live

01Contact
02Safe
03Reliable
04Versatile
05Experienced
06Cost Effective
07Professional
02About HG Wells Ltd

Experience that stays close to the well.

HG Wells Ltd. was formed in 1997 with the aim to provide a professional and experienced consultation service to the Oil and Gas Industry.

Since its expansion into Well Intervention Services, HG Wells Ltd. has continuously provided safe, cost effective and professionally executed well intervention jobs to a number of Oil and Gas Operators.

01Safe
02Reliable
03Versatile
04Experienced
05Cost Effective
06Professional
What really matters is what you do with what you have.
H. G. Wells
03Specialist services

The detail is where confidence starts.

The right specialist, the right equipment, the right decision at the right moment. HG Wells brings the complete intervention picture into focus.

Field tested experienced thinking
from first call to final report.
HG Wells mobile wireline unit fully deployed with mast raised and crew operating equipment

The HG Wells Wireline System.

01 / 07

Wireline

A self-contained ASEP wireline truck with a truck-mounted mast, enabling slickline or braided line operations without the need for an additional on-site crane.

  • Slickline and braided line operation
  • CBL, CCL, caliper and production logging
  • Perforating, surveying and gauge solutions

Standards & assurance

50+ years combined slickline experience

Need to solve your well intervention puzzle?

HG Wells —
the missing piece.

  • 01Slickline
  • 02Wellhead maintenance
  • 03Supervision
  • 04Competent crew
  • 05POB reduction
  • 06Fast response
  • 07Proven experience
  • 08Service quality
04Our operating principle

Clear heads.
Controlled wells.

We exist to make safe, cost effective and professionally executed well intervention jobs feel straightforward — even when the well is anything but.

01

Understand

The well, the barrier, the consequence.

02

Prepare

People, tools and interfaces before mobilisation.

03

Execute

Calm decisions with a record that stands up.

05Case studies

Proof, in the field.

Three real HG Wells jobs: the problem, what the crew did, and how it ended. Client names withheld.

Operational Statistical Performance

Operational figures will be added here, covering the number of operations and runs, wells undergoing WHM integrity testing, and Error Avoidable NPT.

Wellhead maintenance + slickline

Upper Master Valve Actuator failure

A serious actuator failure found during routine wellhead maintenance, with an OEM parts wait of 60–90 days minimum.

14 daysto reverse engineer the damaged components, against a 60–90 day OEM wait
QACertified management systems

Audited.
Zero non-compliances.

HG Wells has held ISO 9001, 14001 and 45001 (formerly 18001) accreditation since April 2017. The compliance audits of July 2025 and August 2026 identified zero non-compliances.

Original approval
12 April 2017
Current certificates
12 April 2024
Expiry
11 April 2027
Scope
Well intervention, consultancy and equipment supply
Audits
July 2025August 2026— zero non-compliances
  • ISO 9001:2015

    Quality management

    Issued 12 Apr 2024 · Expires 11 Apr 2027

  • ISO 14001:2015

    Environmental management

    Issued 12 Apr 2024 · Expires 11 Apr 2027

  • ISO 45001:2018

    Occupational health & safety · Formerly OHSAS 18001

    Issued 12 Apr 2024 · Expires 11 Apr 2027

Training & competency

Zero competence exposure on the client job.

HG Wells training and job planning at a desk

Competence Assurance Program

HG Wells runs its own bespoke Competence Assurance Program (CAP), tailored to its Slickline and Wellhead Maintenance services. It maps employees from trainee level through to senior operator — after which they can move onto the Supervisor Competence program.

  1. 01Trainee
  2. 02Assistant Operator
  3. 03Operator
  4. 04Senior Operator
  5. 05Supervisor

Senior field staff hold IWCF Level 4 Well Control, and the CAP also includes Well Control modules designed around HG Wells' core services.

The Personal Log

Every candidate and employee has a record of the basic and critical tasks required to obtain and prove competence, how many times each task has been successfully completed, and the level at which it was performed:

  • Under Supervision
  • Normal Operation
  • Supervising the Task

Crew deployment decisions use this record, so the assigned crew always contains the right level of competence for the job task.

Training

All staff complete the required basic training modules, in house or via third-party providers depending on topic. Practical technical training runs internally through tool training sessions or operational simulation, both assessed by the Competency Assessor. Theoretical sessions are delivered internally against the specific competence criteria.

Competence-based training for others

HG Wells can provide competence-based training to its own employees or to third parties, including clients. Combining practical and theoretical training, it can be in-depth for candidates directly involved in the service, or at appreciation level for clients needing a basic understanding.

Equipment inventory

Land or offshore. Owned and ready.

Standard and Bespoke equipment packages tailored to clients operational requirements, covering onshore or offshore operational environments. Package capability across Slickline / Wireline, Well Head Maintenance across a full range of completion sizes and well pressure requirements.

Truckline unit deployed with pressure control equipmentSpecialist yellow oilfield tool

  • ASEP Truckline Units — single and dual drum
  • Light Weight Fly line units
  • Slimline Units
  • Slim Split Units
  • Braided cable package capability
  • ASEP Unit Packages conducive to drum interchangeability

06Field photography

The work is real.
Show it properly.

HG Wells crews, trucks and tooling on real UK jobs. The mobile wireline unit opens its own four-photo set.

HG Wells wireline truck at a UK land well site at sunset
UK land operations

Wireline at last light

HG Wells mobile wireline unit fully deployed with mast raised
View 4 photos

Mobile wireline unit

HG Wells wireline crew working at the wellhead
People close to the work

The crew

Local & social community

Family owned.
Locally rooted.

As a smaller family owned and managed company, HG Wells values local enterprise. Where possible, and in line with its service delivery process, HG Wells engages local businesses for service provision. Over a number of years, the company has also worked with local colleges in support of apprenticeships.

  • 01Local manufacture and machine shop services
  • 02Transportation and service repair
  • 03Consumable supplies
  • 04Apprenticeship support with local colleges
07Built for the handover

The job ends.
The knowledge stays.

Barrier-minded by default

Every decision is made in the context of well integrity, operational risk and the people closest to the work.

Ready when the window opens

Equipment supply, technical preparation and responsive people that keep a short operational window moving.

NOW RECRUITING

Experienced Slickline Senior Operator / Supervisor — minimum 10 years field experience, UK based.

View vacancy
08Contact

Let’s make
the next move.

Tell us what the well is asking for. We’ll come back with a clear view of the work, the interfaces and the way through.

Your details will be emailed to HG Wells so the team can respond to your enquiry.